Runs |
Drives |
Stops |
|
April 1, 2009: Assembling the ductwork and exhaust | |||
April 4, 2009: Tweaking the points | |||
April 8, 2009: Changing the gear oil, and replacing the transmission pan gasket. | |||
May
7, 2009: Repairing the leaking (stock, vacuum operated) fuel valve |
|||
August
7, 2009: Replacing the oil seal on the left end of the crankshaft |
|||